Updated list:

Still Left To Do:

Buy door trim/baseboard, paint, cut and install

Install Vent cover

Buy and build new stool from Ikea

Buy, stain and install wooden thresholds and metal thresholds

Caulk backsplash where caulk has shrunk (and dig out a bad spot I found yesterday) (I promised Jim to do this this week)

Filler panel between fridge and over-fridge cabinet and under cabinets on either side of microwave

Filler pieces cut and installed for under microwave

Install paper towel holder and foil/plastic wrap holder on inside of sink cabinet doors (this is put on hold due to the fact that the door might not be thick enough)

Adjust doors and drawers so that they are all perfectly level, then install soft close hinges

Electrician out to do finish electricity 

Electrical inspection (Passed!)

Drawer pulls

Figure out configuration of island interior (shelves on one side/drawers on other–depends on how electrical outlet will fit) and install drawers/shelves

Seal backsplash – First coat, second coat (I promised Jim to do this this week)

Outside: fix/replace trim/siding and an outlet from door installation

Return unused/unneeded stuff to Ikea (October 7th)

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s