The plan for the day was to put insulation in all the open spots, fix all the drywall and maybe start mudding.

Unfortunately, we discovered that the HVAC vent pipe the runs up the wall from the basement to our master bedroom sticks out too far and Jim can’t put drywall over it and have it be flat.

HVAC company will be here Monday 10am. Sigh.

Insulation can still be installed in most of the places and drywall can still be fixed, but that giant gaping hole from floor to ceiling will still be there at end of day.